FAQs
Answers before you ask
Everything you need to know about building an ADU in the Columbia Gorge, from feasibility and cost to permitting and timelines. Still curious? We’re always happy to talk it through.
01 - ADU Basics
Start here
What an ADU is and what you can build.
-
An ADU (Accessory Dwelling Unit) is a smaller secondary home built on the same property as a primary residence. ADUs can be attached to the main home, converted from existing space, or built as separate structures depending on zoning and site conditions.
Common uses include:
Rental income
Guest housing
Multigenerational living
Home offices or studios
Housing for aging parents or adult children
-
A DADU (Detached Accessory Dwelling Unit) is a standalone ADU that is physically separate from the main house.
Examples include:
Backyard cottages
Tiny homes
Detached garage apartments
A DADU functions like a small independent home with its own living space, kitchen, bathroom, and entrance.
-
An ADU is the general category for a secondary living unit on a property.
A DADU is a specific type of ADU that is detached from the main home.
Examples:
Garage conversion = ADU
Basement apartment = ADU
Backyard cottage = DADU
-
We can build nearly any architectural style, including:
Modern
Cottage
Craftsman
Farmhouse
Minimalist
Contemporary
Entry-Level Studio Designs
We also offer customizable siding, paint, and finish options.
02 - Your Property
Building on your land
Feasibility, zoning, size, and site conditions.
-
It depends on:
County and zoning regulations
Lot size
Utility access
Septic or sewer capacity
Scenic Area restrictions
Setback requirements
We can help determine if your property qualifies.
You can contact us directly or submit your property information for a site review and feasibility analysis.
Reports can be sent to:
quantumbuildersnetwork@gmail.com
design@gorgeadu.com -
This depends on county regulations and zoning requirements.
Common Klickitat County considerations:
Detached ADUs often must be within 200 feet of the primary home
Shared driveway access is commonly required
Existing wells usually must serve both dwellings
Septic capacity must be verified
Scenic Area parcels may have additional restrictions
Maximum square footage varies by jurisdiction.
-
Height limits depend on:
Zoning
Setbacks
Roof design
Scenic Area restrictions
Site-specific conditions
In many cases, reasonably tall structures are allowed if they meet county requirements.
-
Possibly.
If the existing septic system has enough remaining capacity, the ADU may be able to tie into it. This typically requires:
Septic evaluation
Capacity verification
County approval
In some cases, upgrades or system expansion may be required.
03 - Cost & Timeline
Budget and timing
What to plan for and how long it takes.
-
Most ADU projects we are currently seeing range between:
$200,000 – $400,000+
Pricing depends on:
Site conditions
Utilities
Septic requirements
Design complexity
Size
Interior finishes
Permitting and engineering
-
Our Initial Site Review is a $500 value.
If the property is ultimately determined to be non-viable for an ADU project, that fee is refunded.
-
Permitting timelines vary by county, parcel conditions, and project complexity.
Using template designs and prescriptive building methods can significantly reduce approval timeframes.
Typical Timelines
Klickitat County
Best case: ~1 month
Typical rural ADU: 2–3 months
Scenic Area or complex parcel: 4–6+ months
Hood River County
Inside city limits with clean lot: 1.5–2.5 months
Rural county parcel: 2–4 months
Scenic Area / EFU complications: 4–8+ months
04 - Working Together
Working with us
How we collaborate on your project.
-
Yes.
We understand many homeowners have construction skills and may want to contribute to keep costs down.
As long as homeowner participation helps workflow and does not create delays, collaboration is welcome.
However:
Homeowner-completed work may require signed waivers
Any homeowner-touched work may be exempt from certain final product complaints or warranties